TOP TEAM GbRTOP TEAM BAUGbR · Kassel
0160 51 90 900
Menu

Our services

Explore all pages27 pages
EN

Screeds and Subfloors

Calcium Sulfate Screed in Kassel

Application area and moisture exposure are considered during material selection.

Preparation and Important Information

Material selection and application area are checked against moisture exposure and floor covering. Preparation, drying, and required substrate testing are scheduled before covering.

Scope of Work and Handover

Approval for the intended covering is based on the relevant criteria. Measurements, heating, and joints are coordinated with the next trade.

Screeds and subfloors are coordinated with adjoining services. Our proposal specifies materials, execution, interfaces, and planned construction phases. If additional work becomes apparent in the existing structure, we discuss it before proceeding.

Work Involved and Proposal

Area, layer composition, transport, leveling, and preparation determine the work involved. Drying and necessary measurements are included in the schedule; a fixed calendar date alone does not confirm readiness for floor covering.

Coordinate calcium sulfate screed with use and floor covering

For which rooms is the assembly being assessed?

Share the use, planned floor covering and known moisture exposure. Available construction depth and existing insulation also belong in preparation. Specialists assess whether a specific material system suits the application based on the whole assembly, rather than the screed designation alone.

Which interfaces exist with the fit-out?

Heating, room transitions and heavy fixtures can affect execution and sequencing requirements. Provide relevant plans and product information together. Joints, perimeter connections and preparation for the future floor covering are coordinated before the area is installed and subsequently worked on.

How is subsequent work planned?

Drying and required testing must fit the construction sequence. An agreed calendar date alone does not confirm readiness for floor coverings. The quotation should identify preparation, installation and allocated testing tasks so that screed and flooring work use the same approval criteria.

Related services: screed and subfloors · readiness for floor coverings.

More Services in This Category

Calcium Sulfate Screed: Discuss Your Project

Where is the work planned, how extensive is it, and when would you like to begin? Send us any available plans or photos and tell us how you intend to use the space. We will clarify the next steps for your project in Kassel and the surrounding area.

Request a Project Quote0160 51 90 900