Screeds and Subfloors in Kassel

A durable floor starts beneath the visible covering. TOP TEAM provides screed and subfloor work in Kassel. Installation height, intended use, insulation, and any underfloor heating determine the construction.

Construction and Installation Tailored to Your Project

Screed is selected according to loads, assembly height, substrate, and planned floor covering. A heated assembly has different process and approval requirements than dry screed. Perimeter areas, joints, and transitions to adjoining rooms are specified before installation. The complete floor assembly is decisive.

Cement Screed

Layer thickness, loads, and subsequent use are agreed before installation.

The assembly is coordinated with loads, substrate, and covering. Joints, perimeter areas, and required drying are coordinated with subsequent work; installation alone does not mean approval for floor covering.

Calcium Sulfate Screed

Application area and moisture exposure are considered during material selection.

Material selection and application area are checked against moisture exposure and floor covering. Preparation, drying, and required substrate testing are scheduled before covering.

Dry Screed

Panel construction, substrate, and load distribution are matched to the task.

Dry screed can be installed with coordinated leveling and insulation layers. Flatness, loads, and door connections are clarified beforehand; suitability depends on the entire system.

Heated Screed

Heating circuits, joints, and the process leading to readiness for floor covering are planned together.

Screed, heating circuits, and perimeter details are planned together. The sequence includes the planned heating and testing measures before the final floor covering is installed.

Floor Leveling

Unevenness is addressed according to measurements and the requirements of the final covering.

Unevenness is recorded before leveling. The substrate, required layer thickness, and planned covering determine materials and preparation; door heights and room transitions are also considered.

Readiness for Floor Covering

Required substrate tests are scheduled before further work.

Whether a substrate can receive a covering depends on the material, moisture condition, and intended covering. Required testing is coordinated with the next trade; elapsed waiting time alone is insufficient evidence.

Information That Helps with the Initial Discussion

  • Planned coverings and available assembly height
  • Substrate, moisture, and underfloor heating
  • Joints, transitions, and site access

What Affects the Work and Cost?

Area, layer composition, transport, leveling, and preparation determine the work involved. Drying and necessary measurements are included in the schedule; a fixed calendar date alone does not confirm readiness for floor covering.

From the First Discussion to Handover

  1. Record the project, existing conditions, and desired result.
  2. Coordinate planning, material selection, and trade interfaces.
  3. Document the services and sequence in the proposal.
  4. Coordinate installation and check the agreed details.
  5. Review the result together and document the handover.

Approval for the intended covering is based on the relevant criteria. Measurements, heating, and joints are coordinated with the next trade.