TOP TEAM GbRTOP TEAM BAUGbR · Kassel
0160 51 90 900
Menu

Our services

Explore all pages27 pages
EN

Screeds and Subfloors

Floor Leveling in Kassel

Unevenness is addressed according to measurements and the requirements of the final covering.

Preparation and Important Information

Unevenness is recorded before leveling. The substrate, required layer thickness, and planned covering determine materials and preparation; door heights and room transitions are also considered.

Scope of Work and Handover

Approval for the intended covering is based on the relevant criteria. Measurements, heating, and joints are coordinated with the next trade.

Screeds and subfloors are coordinated with adjoining services. Our proposal specifies materials, execution, interfaces, and planned construction phases. If additional work becomes apparent in the existing structure, we discuss it before proceeding.

Work Involved and Proposal

Area, layer composition, transport, leveling, and preparation determine the work involved. Drying and necessary measurements are included in the schedule; a fixed calendar date alone does not confirm readiness for floor covering.

Define leveling work around the future floor covering

What should be improved about the floor?

Describe unevenness, changes in level and the planned new surface. A floor plan showing thresholds and adjoining coverings helps the survey. Only assessment of existing conditions can establish whether local leveling is sufficient or more extensive preparation and further substrate investigations are required.

What limits does construction depth impose?

New layers change transitions at doors, stairs and neighboring rooms. Underfloor heating and fixed installations may also be affected. Materials and pretreatment are therefore matched to the substrate, required layer and floor covering instead of being selected solely for a desired smooth appearance.

What does the completed service include?

Make sure preparation, leveling and any subsequent treatment are identifiable in the quotation. Condition checks and approvals for the flooring installer are included in coordination. A clear handover describes which areas are prepared for which intended coverings and which tasks remain with the next trade.

Related services: screed and subfloors · readiness for floor coverings.

More Services in This Category

Floor Leveling: Discuss Your Project

Where is the work planned, how extensive is it, and when would you like to begin? Send us any available plans or photos and tell us how you intend to use the space. We will clarify the next steps for your project in Kassel and the surrounding area.

Request a Project Quote0160 51 90 900