TOP TEAM GbRTOP TEAM BAUGbR · Kassel
0160 51 90 900
Menu

Our services

Explore all pages27 pages
EN

Demolition, Dismantling, and Concrete Cutting

Gut-Out Work in Kassel

Fixtures, coverings, and unnecessary structures are removed in an organized manner.

Preparation and Important Information

During gut-out work, the structural shell to be retained is clearly distinguished from interior finishes and fittings. Utilities and fixtures are dismantled in an organized manner; suspect materials are investigated before disturbance.

Scope of Work and Handover

After dismantling, connection surfaces and remaining elements are reviewed together. Documented openings and agreed disposal records support the subsequent construction.

Demolition, dismantling, and concrete cutting are coordinated with adjoining services. Our proposal specifies materials, execution, interfaces, and planned construction phases. If additional work becomes apparent in the existing structure, we discuss it before proceeding.

Work Involved and Proposal

Material, thickness, reinforcement, transport routes, and disposal requirements determine the work involved. For core drilling and saw cuts, diameter, depth, component position, and securing the separated piece are important.

Plan strip-out work around the future fit-out

Which layers need to be removed?

A floor plan showing removal boundaries helps distinguish fixtures, floor finishes, ceilings and partitions. Explicitly mark doors, surfaces and technical systems that should be retained. Also explain which rooms will be rearranged or put to a different use after the strip-out.

What needs to be checked beforehand?

Unknown utilities, concealed construction and suspect older materials first require specialist investigation. Previous alteration drawings or material information can make this preparation easier. In occupied or commercially used buildings, segregated areas and coordinated transport routes are particularly important.

What condition will be handed over?

Define whether exposed structural components are sufficient or whether further preparation for the fit-out should be included. Protection, sorting and removal should be separate tasks in the scope of work. A clear handover prevents essential outstanding work from becoming apparent only when the next trade starts.

Related services: demolition, dismantling and concrete cutting · core drilling.

More Services in This Category

Gut-Out Work: Discuss Your Project

Where is the work planned, how extensive is it, and when would you like to begin? Send us any available plans or photos and tell us how you intend to use the space. We will clarify the next steps for your project in Kassel and the surrounding area.

Request a Project Quote0160 51 90 900